
BeforeAfter
Bathrooms
One of the most requested bathroom jobs in Naples: a tub nobody uses becomes a walk-in shower you can step into for the next twenty years.

Curbless or low-curb
A curbless shower needs the drain lowered or moved so the floor can slope to it. In a slab-on-grade home that means cutting the slab, which is routine. In many condos the drain cannot move, so we build a low-curb shower with a linear drain instead. We tell you which at the walkthrough, with the reason.
Everything else is your choice: tile, a niche or two, a bench, a hand shower on a slide bar, and where the grab bars go now versus where we leave blocking for later.
Get my Free Consultation5.0 from 87 reviews of our Sarasota team
Thank you, thank you thank you for a gorgeous kitchen!!!
Journey J.Google review, Oct 2026
Leo and Liam are unicorns in this industry. They kept their word and delivered on all promises. …
Vince B.Google review, Jun 2026
Lior and Adam made the complete home remodel easy and seamless. Their quality of work is second to none …
John C.Google review, Sep 2026
Green Home Remodeling and our project manager Leo and his crew were awesome! Beautiful work at very competitive pricing! …
Olaf P.Google review, Apr 2026
Amazing service. They did a great job. The workers were very friendly and did a meticulously fantastic job. …
Lizette R.Google review, Jul 2026
Lior and his team did amazing job I really recommend!!
MichaelGoogle review, Sep 2026
Proven in Sarasota, now in Naples
One team takes out the tub, reworks the plumbing, waterproofs, tiles and glazes the shower, and closes the permit.
Get my Free ConsultationThe tub and surround come out and are hauled away to your building's rules.
Curbless where the drain can be lowered or moved; low-curb with a linear drain where it cannot. We tell you which at the walkthrough, with the reason.
A new valve, shower head and hand shower on a slide bar, with the drain moved where the slab allows.
A waterproofing membrane goes behind and under every wet surface, then a 24-hour flood test, photographed, before any tile is set.
Porcelain tile on the floor and walls, with a niche or two and a built-in bench.
A frameless glass enclosure, measured and fitted to the finished opening.
Two grab bars with in-wall blocking are included, plus blocking wherever you might want a bar later.
Moving plumbing needs a permit. We pull it, book the inspections and close it before your final payment.
Our work
Captioned honestly: our Sarasota team's work. Naples projects will be added as they finish.

BeforeAfterFAQ