Remodeling Permits in Naples and Collier County

Who applies, who inspects, what the Notice of Commencement is, and why the final payment waits for the word 'finaled'.

Which jobs need a permit

Any work that touches plumbing, electrical or structure: moving a drain, adding a circuit, removing a wall, replacing a water heater, and most kitchen and bathroom remodels. Paint, cabinet doors and a like-for-like faucet do not. If in doubt, the answer is usually yes, and the cost of a permit is small next to the cost of unpermitted work at resale.

Which office

Addresses inside the City of Naples limits apply to the city building department. Everything else in Collier County applies to the county's Growth Management division. Your tax bill shows the jurisdiction. The two offices have different online portals, review times and inspection scheduling, which is one reason we handle it rather than you.

How long it takes

Simple kitchen and bath permits are often issued within one to three weeks; anything with engineering takes longer. We apply within 30 days of your deposit, or after board approval for condos, and the dates go into your schedule. Permit timing is set by the office, and it is one of the things we do not promise.

The Notice of Commencement

For jobs over $2,500 a Notice of Commencement is recorded with the county before work starts, and the county wants it before the first inspection on contracts over $5,000. It expires if work does not start within 90 days. It protects you by starting the clock on lien rights, and it is a line on your estimate.

Inspections and closeout

Rough plumbing and electrical, waterproofing where the office requires it, and a final. We book them, we attend them, and the passed inspection record comes with each payment request. The final payment on every job waits until the permit reads finaled on the portal, where you can check it yourself.

FAQ

Questions Naples owners ask

Does my remodel need a Collier County or City of Naples permit, and how long does it take?
Yes for plumbing, electrical or structural work. The city issues permits inside its limits, the county elsewhere. Simple permits often take one to three weeks; engineering adds time. We apply within 30 days of the deposit.
Who pulls the permit?
We do, under CGC1534542. A homeowner can pull their own permit in Florida, but then the homeowner carries the responsibility. We do not work on owner-pulled permits.
What happens if the inspection fails?
We fix it and re-book. You are not billed for that stage until it passes.

Not the cheapest. Never a surprise.

Tell us about the room. We'll send a price you can check.

A written, itemized estimate after the walkthrough, held for 30 days, with the payment schedule and warranty attached. No pressure visit, no lump sums.

Text a photo of your kitchen to (239) 000-0000We reply with a price range, not a sales call.

Step 1 of 4. What are you remodeling?

What are you remodeling?
Your property
Budget and timing

Budget

Timing

How to reach you

Next: your property, then budget and timing, then how to reach you. Nothing is shared and there is no obligation.